Skip to content
Archive of posts tagged Mining

Ground Geophysical Survey on the Anza Property completed: Waymar Resources (TSX VENTURE: WYM)

January 31, 2011, VANCOUVER, BRITISH COLUMBIA -(Coal Geology) – Waymar Resources Ltd. (“Waymar” or the “Company”) (TSX VENTURE: WYM) has announced that Arce Geofisicos of Lima, Peru has completed a 30 km orientation Pole-Pole Induced Polarization (“IP”), Resistivity and Magnetometry survey on the Anza property, centred on La Pastorera volcanic massive sulphide (“VMS”) occurrence, during [...]

MSHA announces results of December 2010 impact and regularly scheduled inspections

ARLINGTON, Va., Jan. 27, 2011 /Coal Geology/ — The U.S. Department of Labor’s Mine Safety and Health Administration today announced that federal inspectors issued 288 citations, orders and safeguards during special impact inspections conducted at 13 coal and 4 metal/nonmetal mine operations last month.  The coal mines were issued 170 citations, 15 orders and one [...]

Mountain top removal mining (MTR) in USA: Coal mining and regulations

January 18, 2010 (Coal Geology): Mountaintop/Mountain-top/Mountain top removal mining (MTR), also known as mountaintop mining (MTM), is a form of surface mining that involves the mining of the summit or summit ridge of a mountain. Entire coal seams are removed from the top of a mountain, hill or ridge by removing the so-called overburden (soil,lying [...]

Mountaintop removal coal mining in Tennessee identified among Top 10 Endangered Places in the Southeast

CHARLOTTESVILLE, Va., Jan. 18, 2011 (Coal Geology)– The Southern Environmental Law Center (SELC), which has used the power of the law to defend the South’s natural resources for 25 years, has released its third annual list of the top ten places in the South that face immediate, potentially irreversible damage in 2011. This year’s list [...]

Coal Mining helped Sarawak’s Economic growth at 5.4% in 2010

KUCHING, Sarawak, Malaysia, January 18, 2011(Coal Geology)- Sarawak’s economy has grown by approximately 5.4% in 2010 exceeding predictions made in May of a 4.5% increase. The growth is the result of several major infrastructure projects the government is implementing as part of the Sarawak Corridor of Renewable Energy (SCORE) project, which will develop a vast [...]